Inspecciones - Centrales generadoras de energía eléctrica | OCA Global
Select country:

Spain

ES / CA / EN

Andorra

ES / EN / CA

Saudi Arabia

ES / EN / عر

Brasil

ES / EN / PO

Chile

ES / EN

Colombia

ES / EN

Egypt

ES / EN

Arab Emirates

ES / EN

India

ES / EN

Morocco

ES / EN / FR

Mexico

ES / EN

Panamá

ES / EN

Peru

ES / EN

Portugal

ES / EN / PO

Romania

RU / EN

South Africa

ES / EN

Ukraine

ES / EN

Italia

ES / EN

Pressure equipment

Electric energy generating plants

Applicable to all pressure equipment included in the enclosure of an electric energy generating plant with a power exceeding 50MW, including thermal, hydraulic, combined cycle, nuclear, and urban solid waste incineration plants.

Equipment excluded:

  • Fire extinguishers.
  • Equipment classified or assimilated to Article 3.3. (PED 97/23/EC o REP Art. 3.2).
  • Transportable pressure equipment included in the scope of application of Royal Decree 222/2001 (Directive 1999/36/EC on transportable pressure equipment).
  • Equipment integrated in refineries and petrochemical plants included in ITC EP-3. 
  • Cryogenic deposits included in ITC EP-4.
  • Devices designed specifically for nuclear use whose failure can cause radioactive emissions.    

Safety valves should be inspected by an Authorised Inspection Agency (AIA) during ordinary shutdowns or periodic inspections. This type of inspection also includes other specific requirements necessary for this type of plants. 

Applicable regulation

  •        Royal Decree 2060/2008
  •        ITC EP-2    
Electric energy generating plants

Specific search

If you already know it, find it faster

Business lines